A 100 capacity Ironing hall with a meter room and changing room situated at Our Lady of Apostles’ Girls Senior High School at Kenyasi. The building foot print is 180m2 and a height of 4.2m above ground. It has fixed reinforced concrete ironing platforms with clearance of 0.9m from each board. The hall is designed to maximize natural ventilation and daylight to reduce heat trapping in the building.

Project Experts: Project Manager, Structural Engineer, Architect, Electrical/HVAC Engineer, Quantity Surveyor